FLEET TELEMETRY · LIVEUPDATED CONTINUOUSLY

Aggregate BTUs Delivered · All Installed Systems

0 BTU
+9K BTU/min across active systems

Your HVAC Clients Are Asking
About Geothermal. We're the License
Behind Your Answer.

Bore drills closed-loop and open-loop geothermal systems beneath suburban lawns and commercial lots. White-label partnerships for HVAC contractors, MEP engineers, and GCs who need a licensed driller on the team sheet before the proposal deadline.

§ 01 · Fleet Performance Data

Numbers audited at the wellhead,
not in a marketing deck.

All metrics derived from AHRI-certified field measurements and IRS-documented incentive filings across the Bore partner network, 2022–2025.

Avg Loop Field Efficiency

94.2%

+2.1% vs prior season

Measured across 847 active vertical bore fields

Mean COP · Heating Mode

4.7×

vs. 0.95 gas furnace

Fleet average, AHRI-certified test conditions

Avg Payback Period

6.4 yrs

w/ IRA §48 credit applied

Residential; commercial avg 5.1 yrs w/ MACRS

Incentives Captured · YTD

$3.2M

Across 214 projects · 2025

Federal tax credits + state utility rebates

LEED Points Contributed

12–18 pts

EA + SS categories

Per USGBC guidance for ground-source systems

Drill Mobilization Lead Time

14 days

Avg from PO to on-site

Contractual SLA for partner accounts

Data current as of Q4 2025. Third-party verification available upon execution of NDA. COP values per ASHRAE Standard 116.

§ 02 · Project Type Comparison

Every parameter. Every project class.
Contractor voices attached to the specs.

The table below compares Bore's documented performance across residential, light commercial, and institutional project types. Contractor testimonials are embedded beneath each parameter row — the numbers and the witnesses agree.

Parameter

Residential

Single-family · <5 tons

Light Commercial

Office / Retail · 5–40 tons

Institutional

Schools / Municipal · 40+ tons

Typical Loop Field Size

Vertical bore, 200 ft depth

2–4 bores · 400–800 lin ft6–16 bores · 1,200–3,200 lin ft24–80 bores · 4,800–16,000 lin ft
"Bore laid out our loop field in a 0.4-acre lot we thought was too tight. They hit 210 ft on every bore and we had the school's mechanical room commissioned six weeks ahead of schedule."

Marcus Reinholt

Principal, MEP

Reinholt Engineering Group · Columbus, OH

Jefferson K-8 · 44-ton system · 2024

System Capacity

Tons (12,000 BTU/ton)

2–5 tons10–40 tons50–400 tons

COP Range · Heating Mode

Coefficient of Performance

3.8 – 4.9×4.2 – 5.1×4.5 – 5.6×
"Our mechanical engineer spec'd a 4.5 COP floor for the LEED submittal. Bore's loop field hit 4.9 in the first heating season — that's the number that got us EA Credit 1."

Sandra Okafor

LEED AP BD+C · Project Engineer

Meridian MEP · Philadelphia, PA

Northside Community Center · 28-ton · 2023

SEER Equivalent

Cooling mode comparison

18 – 22 SEER22 – 26 SEER26 – 34 SEER

IRA §48 Tax Credit Eligible

Inflation Reduction Act 2022

30% of system cost30% of system cost30% + bonus adders up to 50%
"The 30% ITC closed the budget gap on three school projects in one fiscal year. Bore's documentation package was exactly what our CPA needed — no back-and-forth."

Derek Vasquez

Director of Facilities

Lakeshore Unified School District · Chicago, IL

3 campuses · 180 tons aggregate · 2024–2025

Avg Simple Payback Period

Post-incentive, vs. gas/electric

6–9 years5–7 years4–6 years

Drilling Footprint Required

Surface area during install

15×15 ft per bore12×12 ft per bore10×10 ft per bore
"We were white-labeling Bore for a customer with a finished backyard. Their crew drilled four bores in two days, re-seeded the cores, and you couldn't tell they'd been there."

Tony Ferraro

Owner

Ferraro Mechanical · Hartford, CT

Residential retrofit · 4-ton · 2023

Bore Depth Range

Subsurface installation

150–300 ft200–400 ft200–500 ft

HDPE Pipe Warranty

Factory-fused loop piping

50 years50 years50 years

Mobilization Lead Time

PO to on-site (partner SLA)

10–14 days14–21 days21–45 days
"Bore was on my bid sheet two days after I called. They had insurance certs and a license number I could put in the proposal before the GC deadline. That's what won us the job."

Jennifer Kwon

VP Estimating

Kwon Mechanical Contractors · Pittsburgh, PA

Net-zero office campus · 90-ton · 2025

White-Label Sub Agreement

Partner branding support

AvailableAvailableAvailable

LEED Documentation Package

EA + SS credit support

— Not typically requiredOn requestIncluded standard
"I needed a full loop-field thermal conductivity report, grouting logs, and ASHRAE 90.1 compliance docs for a LEED Gold submittal. Bore had the folder ready before I finished the specs."

Priya Nambiar

Principal Mechanical Engineer

Nambiar + Hollis Engineers · Boston, MA

Mixed-use LEED Gold · 55-ton · 2024

All values reflect Bore fleet averages 2022–2025. COP values per AHRI/ASHRAE certification. Payback periods assume current utility rates and full IRA §48 credit eligibility. Individual project results vary by geology, load profile, and local incentive availability.

§ 03 · Partner Application

Become a Drilling Partner

White-label geothermal drilling for licensed HVAC contractors, mechanical engineers, and general contractors. Proof first — we review fleet data with every application.

State-issued license number. Verified against NASCLA database.

Applications reviewed within 2 business days. License verification required before account activation.

§ 04 · Contractor Spec Sheet

Loop-field data for your active bid.
No sales call required.

Engineers specifying ground-source heat pumps for LEED submittals need thermal conductivity data, grouting specs, and ASHRAE compliance references before the design is frozen. The Bore Contractor Spec Sheet has everything — gated behind a single email address.

Document Contents (14 pages)

Loop Field Thermal Conductivity Tables

By geology type — granite, limestone, clay, sandstone

HDPE Pipe Sizing Calculator

For 1″, 1¼″, 1½″ DR-11 configurations

Bore Spacing & Depth Design Guidelines

Per IGSHPA standards, 10–20 ft center-to-center

Grouting Specification Matrix

Thermally enhanced grout vs. bentonite by formation

IRA §48 Credit Documentation Checklist

IRS Form 3468 supporting documentation

ASHRAE 90.1 Compliance Reference Sheet

For LEED EA prerequisite submissions

Mobilization & Site Prep Requirements

Rig access, staging area, utility clearance specs

Sample Loop Field Completion Report

As-built format accepted by most AHJs

Download the Contractor Spec Sheet

Enter your email and receive the 14-page PDF immediately. No spam — just the spec data you need.

PDF delivered instantly. Unsubscribe anytime.

14-page technical reference, not a brochure
Used by 340+ MEP firms for active bids
Accepted by USGBC reviewers for LEED submissions

Spec sheet isn't enough? Ready to put Bore on your bid sheet?

Apply for a Partner Account